Work on McGregor’s Main Street reconstruction project shifted south of A Street last week. Two large excavation pits were opened at the intersection of Main and A streets, for the boring of casing pipe underneath the existing historic arch storm sewer located under A Street. “After that is installed, [contractor Portzen Construction] can run the water main through that,” said Alex Jaromin, project engineer with Davy Engineering. (Photo by Audrey Posten)